Pre-Handover (PCI) Inspections in Tallawong

A full walk of the finished house a fortnight or so before you sign for it.

  • Every room, inside and out
  • Facade joints traced in full
  • Upstairs windows checked for limits
  • Thermal scan of wet areas
  • Booked a fortnight before keys
  • Recheck before you sign
  • Safety items flagged first
  • List written for the supervisor
Request a quoteSend your details and an inspector will ring you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

What is included

What is included in a Tallawong pre-handover (PCI) inspection

A handover inspection measures the home against your contract, plans and selections, the NSW Guide to Standards and Tolerances 2017, the National Construction Code and ABCB Housing Provisions, AS 3740 for wet areas and AS 3700 for masonry.

Control and articulation joints

  • Formed, continuous to the top of the wall and sealed, not rendered over.

Cladding and render

  • Cracks, damaged Hebel, patchy final coat and soil clearance at the base.

Window safety

  • Upstairs bedroom openings limited to 125mm where the code calls for it.

Roof sheeting

  • Dents, scratches and flashings, viewed safely from ladder or drone.

Driveway and paths

  • Isolation joint at the slab, caulked joins and falls away from the house.

Bathrooms and laundry

  • Flange to drain seals, grout, silicone and waterstops at doorways.

Kitchen and joinery

  • Drawer action, door gaps, benchtop joins and screw caps.

Doors, frames and plaster

  • Damage to frames and sills, patching visible in normal light.

8 checkpoints across 8 areas on a standard Tallawong pre-handover (PCI) inspection. Please have power on and every room unlocked. On a build, let the supervisor know an independent inspector will attend; anything we cannot reach safely is named in the report.

Sample findings

Items listed at Tallawong handovers

Render covering a control joint, so the wall cannot move where it was designed to, found during a handover inspection in Tallawong
Render covering a control joint, so the wall cannot move where it was designed to
Articulation joint not carried the full height of the wall, found during a handover inspection in Tallawong
Articulation joint not carried the full height of the wall
No isolation joint between the house slab and the new driveway, found during a handover inspection in Tallawong
No isolation joint between the house slab and the new driveway
Dented and scratched metal roof sheeting with the paint coating broken, found during a handover inspection in Tallawong
Dented and scratched metal roof sheeting with the paint coating broken
Hebel panel control joint filled over instead of formed and sealed to depth, found during a handover inspection in Tallawong
Hebel panel control joint filled over instead of formed and sealed to depth
Cracked and broken Hebel panel needing replacement and patching, found during a handover inspection in Tallawong
Cracked and broken Hebel panel needing replacement and patching
Cladding closer to the soil than the 150mm needed against damp and termites, found during a handover inspection in Tallawong
Cladding closer to the soil than the 150mm needed against damp and termites
Open gap where the puddle flange meets the drain body, needing a flexible seal, found during a handover inspection in Tallawong
Open gap where the puddle flange meets the drain body, needing a flexible seal
Benchtop join poorly finished and not sitting in one plane, found during a handover inspection in Tallawong
Benchtop join poorly finished and not sitting in one plane
Cracked and chipped tiles that need replacing before handover, found during a handover inspection in Tallawong
Cracked and chipped tiles that need replacing before handover
Our inspectors reviewing a report together
Why Tallawong owners choose us

Independent. Licensed. Insured.

  • Two storeys on narrow lots
  • Movement joints, checked every time
  • A report you can forward
  • NSW rules, start to finish
Guides

Pre-Handover (PCI) Inspections guides for Tallawong

All guides →

Book pre-handover (pci) inspections in Tallawong

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Pre-Handover (PCI) Inspections in Tallawong: common questions

When should a Tallawong handover inspection be booked?

Around two weeks before the handover date, once the cleaners have been through. That leaves the builder time to work the list and leaves you time for a recheck before any final payment.

What happens if the builder will not fix something on the list?

Ask for a written reason. If you cannot agree, NSW Fair Trading can take a complaint and send an inspector, and the matter can go to NCAT after that. Your report is the dated record either way.

What does a Tallawong handover walk leave out?

Wiring, switchboards, smoke alarms, gas and appliances are not tested and belong with a licensed electrician or gas fitter. We operate doors, windows and drawers by hand only, and do not pressure test plumbing, commission air conditioning or certify the occupation certificate.