Tallawong lots are small and the houses on them are tall, so a lot of structure is packed into a short program. Our August 2026 slab visit here turned up missing corner bars, steel without its cover, mesh hard against plumbing and penetrations with no termite collar, all fixable that afternoon and invisible once the pour was done.

Piers drilled and cages in, concrete not yet ordered
Pier depth and width against the engineering, cage position and cover, clean dry bases
Learn more about the bored piers inspection →
Steel, pods and membrane in place, the day before concrete
Corner bars, cover to steel, mesh clear of pipes, termite collars and taped membrane laps
Learn more about the slab pre-pour inspection →
Frame standing and roof on, before any wrap or lining
Tie down bolts, strap bracing hooped over plates, column connections and lintel clearances
Learn more about the frame inspection →
Walls, roof and external doors done, plaster not yet hung
Lintel bearing, brick ties, articulation joints, sill falls, sarking and cavity cleanliness
Learn more about the lock-up (pre-plaster) inspection →
Doors, stairs and joinery fitted, painter booked next
Balustrade fixing, window and door infills, sealed penetrations and squeaking floors
Learn more about the fixing inspection →
Membrane cured, tiler not yet started
Bond breakers, pinholes, puddle flanges, membrane height and protection from trades
Learn more about the waterproofing inspection →
About two weeks ahead of the handover date
Facade joints, window limits, roof sheeting, driveway joints, grading and wet area seals
Learn more about the pre-handover (PCI) inspection →






Pre-Handover (PCI) Inspections The finished house, walked room by room before you sign.
Defect Investigation Reports One problem traced to its cause and written up properly.
Pre-Purchase Building Inspections An AS 4349.1 report on a young house before you exchange.
Building and Pest Inspections Building condition and timber pests from a single visit. Instant online pricing, or talk to the booking team on 1300 471 805.
Slab and frame carry the structure, and the waterproofing stage matters more than usual because upstairs bathrooms and balconies sit over living rooms. If the budget allows only three, take slab, frame and handover, and add waterproofing for any balcony.
On a contract to build your home you are entitled to arrange an independent inspection. Tell the supervisor the date in writing, wear the right footwear and we handle the rest on the day.