  • Walls, roof and external doors done, plaster not yet hung
  • 1 to 2 hours on site
  • Report within 24 hours
Request a quoteSend your details and an inspector will ring you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage4 of 7
When to bookWalls, roof and external doors done, plaster not yet hung
Time on site1 to 2 hours on site
Inspected againstAS 3700 (masonry), AS 4773, AS 2047 (windows), NCC Part 3.5 roof and wall cladding, manufacturer flashing details

What is included in a Tallawong lock-up (pre-plaster) inspection

  • Wall wrap and roof sarking coverage, laps and tears
  • Head, sill and jamb flashings to every window and door
  • Weep holes clear and correctly spaced
  • Articulation joints and cavity clearance
  • Mortar joints, brick ties and bed joint reinforcement
  • Lintels over openings and their bearing
  • Roof battens, tile or sheet fixing and ridge details
  • Valleys, penetrations and box gutter supports
  • Roof space insulation, sarking and services
  • Exhaust and rangehood ducting runs
  • External cladding fixing and clearance to ground
  • Garage, porch and alfresco set-downs
  • Site drainage and grading before landscaping
  • Debris and mortar droppings at the slab edge
Why it matters here

Lock-up (pre-plaster) inspections on Tallawong builds

At lock-up the bricklayer, roofer, plumber and air conditioning installer have all been through, and each can undo the work of the trade before. Bracing gets cut after the frame has passed, slabs get cut for plumbing, brick ties miss the studs and lintels end up short of bearing. Brick and render facades of the kind going up across Tallawong also need their articulation joints in now, not later.

What we find at this stage in Tallawong

  • Lintel bearing of 100 to 150mm at each end
  • Brick ties fixed into studs
  • Articulation joints at the right spacing
  • Sill bricks falling away from the frame
  • Cavity clear of mortar droppings
Brick sills laid with too little fall away from the windows, found during a lock-up inspection in Kellyville
Brick sills laid with too little fall away from the windows, Kellyville
Tears in the roof sarking that need taping before lining goes up, found during a lock-up inspection in Kellyville
Tears in the roof sarking that need taping before lining goes up, Kellyville
Mortar droppings left in the cavity behind the brick veneer, found during a lock-up inspection in Kellyville
Mortar droppings left in the cavity behind the brick veneer, Kellyville
Sample findings

Sample defects found during our lock-up (pre-plaster) inspections in Tallawong

Annotated findings from Lock-up (pre-plaster) inspections.

Laundry door lintel short of bearing onto the brickwork at each end, found during a lock-up inspection in Kellyville
Laundry door lintel short of bearing onto the brickwork at each end, Kellyville
Structural bracing cut by a following trade, needing an engineer's sign off, found during a lock-up inspection in Kellyville
Structural bracing cut by a following trade, needing an engineer's sign off, Kellyville
Bricks overhanging their steel lintel by 30mm, beyond the 25mm limit, found during a lock-up inspection in Kellyville
Bricks overhanging their steel lintel by 30mm, beyond the 25mm limit, Kellyville
Articulation joint left out of a long run of brick veneer, found during a lock-up inspection in Kellyville
Articulation joint left out of a long run of brick veneer, Kellyville

The other stages of a Tallawong build

  1. Bored piers inspection in Tallawong1Bored piersPiers drilled and cages in, concrete not yet ordered
  2. Slab pre-pour inspection in Tallawong2Slab pre-pourSteel, pods and membrane in place, the day before concrete
  3. Frame inspection in Tallawong3FrameFrame standing and roof on, before any wrap or lining
  4. Fixing inspection in Tallawong5FixingDoors, stairs and joinery fitted, painter booked next
  5. Waterproofing inspection in Tallawong6WaterproofingMembrane cured, tiler not yet started
  6. Pre-handover (PCI) inspection in Tallawong7Pre-handover (PCI)About two weeks ahead of the handover date

All construction stage inspections in Tallawong →

Guides

Construction stage guides for Tallawong

All guides →

Book a lock-up (pre-plaster) inspection in Tallawong

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Lock-up (pre-plaster) inspections in Tallawong: common questions

Why recheck the frame at lock-up?

Because other trades work on it after the frame inspection. Cut bracing and notched studs are common, and this is the last chance to see them.

What is lintel bearing?

The length of a steel lintel resting on brickwork at each end. Short bearing concentrates load on a few bricks and can crack them.

Why do articulation joints matter on a brick home?

They let long walls move with the clay beneath without cracking. If one is missing or bridged, the wall cracks where it wants to instead.

What is cavity cleanliness?

Mortar dropped behind the veneer can bridge the cavity and carry moisture to the frame. The cavity should be clear to the weep holes.

Do you look at the roof sarking?

Yes, where it can be seen from inside. Tears let water and dust through and should be taped before lining.

How long does lock-up take?

Two to three hours on a double storey.